LDPE-3A
LDPE-3A (NORAD 55264, international designator 2023-008B) is a payload object launched on 2023-01-15 from AFETR. It orbits Earth every 1,457.5 minutes at an inclination of 2.8°, between 36191 and 36218 km altitude. Orbit class: Geosynchronous (GEO).
Orbital and catalog data
| NORAD catalog number | 55264 |
|---|---|
| International designator | 2023-008B |
| Object type | Payload |
| Country / owner code | US |
| Launch date | 2023-01-15 |
| Launch site | AFETR |
| Radar cross-section | LARGE |
| Orbit class (approx.) | Geosynchronous (GEO) |
| Inclination | 2.7623° |
| Orbital period | 1457.49 min |
| Apogee altitude | 36217.6 km |
| Perigee altitude | 36191.1 km |
| Eccentricity | 0.0003118 |
| Mean motion | 0.98799803 rev/day |
| RAAN | 79.5711° |
| Argument of perigee | 126.4705° |
| Mean anomaly | 319.3460° |
| Element set epoch (UTC) | 2026-11-25T09:49:46.137792 |
Latest two-line element set
0 LDPE-3A 1 55264U 23008B 26329.40956178 -.00000175 00000-0 00000+0 0 9990 2 55264 2.7623 79.5711 0003118 126.4705 319.3460 0.98799803 13410
Open the ZERUA simulator to see this orbit in 3D · Browse the catalog